Thursday, August 7, 2008

That Took How Long?

While digging through my stash over the weekend, I came across this adorable mini Christmas Stocking I was making.
There was a series of Christmas miniature classes at Knitting Central last year. In, oh, October or November. I don't remember rightly and I don't seem to have blogged about it. But that was, I think, pre-Ravelry when I was neglecting the blog.
Anyway. We were supposed to make the stocking, a sweater, and, uh, two other things. I missed the last two classes.
Although they are little bitty projects and they did knit up quickly, they take a little longer than one might expect.
I whipped through the stocking, but never sewed it. So when I came across it in the dining room credenza, and since I wasn't knitting still but was feeling better. I got it out and finished the seeming.
Which took like 10 seconds. Why on Earth was I stalling?
The sweater, on the other hand, is still sleeveless. I really should look into finishing it as well.

1 comment:

  1. Awww - that's too cute. Aren't mini-stockings fun? Love the design.

    ReplyDelete